Tucson Electric Power (TEP), Arizona: PURPA avoided-cost rates

Tucson Electric Power Company: what it publishes for small generators (qualifying facilities) under PURPA, field by field, with the source for each. Checked on October 4, 2026.

When this may change: At least every two years: the tariff says the QF Purchase Rates will be updated and filed for Commission approval not less than every two years.

Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.

ScheduleRider-11 (R-11), Partial Requirements Service (PRS) and Purchase Rates for Qualifying Facilities (Third Revised Sheet No. 711)

Note: Current sheet is the compliance tariff in the ACC docket; ACC docket filing is a scanned image with an OCR text layer; quotes are from the OCR text and the values were also checked against the page image.

Source: docket.images.azcc.gov: E000052188.pdf · checked 2026-10-04
Docket or orderACC Decision No. 81790 (Open Meeting May 7, 2026), Docket No. E-01933A-17-0360, approving TEP's December 30, 2025 application to update the QF purchase rates; compliance tariff filed May 19, 2026 and re-filed June 11, 2026 (errata correcting the 'Filed By' name), stamped approved by Staff on June 19, 2026.

Note: ACC docket filing is a scanned image with an OCR text layer; quotes are from the OCR text and the values were also checked against the page image.

Source: docket.images.azcc.gov: 0000216615.pdf · also: docket.images.azcc.gov: E000052188.pdf, docket.images.azcc.gov: E000052367.pdf · checked 2026-10-04
Effective date2026-06-01

Note: Tariff footer prints 'Effective: June 1, 2026'; Decision 81790 orders the purchase rates effective June 1, 2026. ACC docket filing is a scanned image with an OCR text layer; quotes are from the OCR text and the values were also checked against the page image.

Source: docket.images.azcc.gov: E000052188.pdf · also: docket.images.azcc.gov: 0000216615.pdf, docket.images.azcc.gov: E000052367.pdf · checked 2026-10-04
Next updateAt least every two years: the tariff says the QF Purchase Rates will be updated and filed for Commission approval not less than every two years.

Note: Prior updates: Decision No. 79357 (May 2024, effective June 1, 2024) and Decision No. 81790 (May 2026). No ACC rule setting the cycle was found; the cycle comes from the tariff text. TEP's general rate case (Docket E-01933A-25-0103) was still pending on 2026-10-04.

Source: docket.images.azcc.gov: E000052188.pdf · checked 2026-10-04
Size capPublished purchase rates apply to QF Customers (generator and load at the same premises) with nameplate capacity 100 kW or less; QFs over 100 kW get individually negotiated contracts under Decision No. 77513. Not available to customers on Net Metering Rider-4.Source: docket.images.azcc.gov: E000052188.pdf · checked 2026-10-04
Resource typesRenewable QFs: rate tables only for Fixed Tilt Solar and Single Axis Solar; cogeneration QFs: on-peak/off-peak rates. QF status per 18 C.F.R. Part 292 Subpart B and ACC Decision No. 52345.

Note: The tariff prints no rate for non-solar renewable QFs.

Source: docket.images.azcc.gov: E000052188.pdf · checked 2026-10-04
Energy rate structureShort-run avoided cost energy rates in cents per kWh, by season (summer = May-September billing cycles, winter = October-April) and by interconnection voltage (distribution vs. high voltage). Renewable QFs: flat seasonal rate by solar technology profile. Cogeneration QFs: on-peak/off-peak (summer on-peak 2-8 p.m. weekdays; winter on-peak 6-10 a.m. and 5-9 p.m. weekdays). A minimum $25.00 monthly basic service charge applies to QF Customers selling energy.Source: docket.images.azcc.gov: E000052188.pdf · checked 2026-10-04
Energy rates (sample cells)
Cell (as labelled, with vintage)RateUnits
Renewable QF 100 kW or less, Fixed Tilt Solar, distribution voltage interconnection, SummerFrom docket.images.azcc.gov: 0000216615.pdf2.198Cents Per kWh
Renewable QF 100 kW or less, Fixed Tilt Solar, distribution voltage interconnection, WinterFrom docket.images.azcc.gov: 0000216615.pdf1.871Cents Per kWh
Renewable QF 100 kW or less, Single Axis Solar, distribution voltage interconnection, Summer2.230Cents Per kWh
Renewable QF 100 kW or less, Single Axis Solar, high voltage interconnection, Winter1.899Cents Per kWh
Cogeneration QF 100 kW or less, distribution voltage interconnection, On-Peak, SummerFrom docket.images.azcc.gov: 0000216615.pdf2.628Cents Per kWh
Cogeneration QF 100 kW or less, distribution voltage interconnection, Off-Peak, Summer2.452Cents Per kWh

Copied as printed: a few labelled cells, not the full rate matrix. The whole schedule is linked below.

Note: Cells without their own source are from the compliance tariff (Sheet 711-3); cells sourced to Decision 81790 come from its Table 2/Table 4 (proposed rates, approved), because the tariff's OCR splits those rows. All values were checked against the tariff page image. Full set: distribution Fixed Tilt 2.198/1.871, Single Axis 2.230/1.924; high voltage Fixed Tilt 2.166/1.846, Single Axis 2.197/1.899; cogeneration distribution on-peak 2.628/2.919, off-peak 2.452/2.640; high voltage on-peak 2.591/2.882, off-peak 2.416/2.606 (summer/winter).

Source: docket.images.azcc.gov: E000052188.pdf · also: docket.images.azcc.gov: 0000216615.pdf · checked 2026-10-04
Capacity paymentNo capacity payment in the published rates. For QFs 100 kW or less able to deliver Firm Capacity, the contract must include a credit of not less than 10% of the standard rate, plus an additional capacity credit when capacity deferrals justify it; terms set in the contract filed with the Commission.Source: docket.images.azcc.gov: E000052188.pdf · checked 2026-10-04
Contract termsWritten contract required for QF Customers; the tariff states no contract term for QFs 100 kW or less. QFs over 100 kW: contract term of no less than 18 years at TEP's long-term avoided cost (Decision No. 77513), filed for Commission approval.

Note: Decision No. 77513 (Dec 17, 2019) is a scan with OCR text.

Source: docket.images.azcc.gov: E000052188.pdf · also: docket.images.azcc.gov: 0000200429.pdf · checked 2026-10-04
Price fixityNot fixed for a term: the tariff purchase rates apply until the Commission approves updated rates (at least every two years); the 2026 update lowered every rate.Source: docket.images.azcc.gov: 0000216615.pdf · also: docket.images.azcc.gov: E000052188.pdf · checked 2026-10-04
Schedule linkhttps://docket.images.azcc.gov/E000052188.pdf

Note: TEP's website copy (docs.tep.com 711-Rider-11-PRS.pdf) was still the superseded Second Revised Sheet effective June 1, 2024 (Decision No. 79357) on 2026-10-04; the ACC docket compliance filing is the current sheet.

Source: docket.images.azcc.gov: E000052188.pdf · also: docs.tep.com: 711-Rider-11-PRS.pdf · checked 2026-10-04

Values are copied as printed in the source. Where a value draws on more than one document, every source is listed, primary first.