Nevada Power Company dba NV Energy: what it publishes for small generators (qualifying facilities) under PURPA, field by field, with the source for each. Checked on October 4, 2026.
When this may change: Annual, in tariff format: NAC 704.8783 requires each utility to file its short-term avoided costs annually, and within 60 days after the Commission issues an order accepting its resource plan. The tariff says rates continue in effect until superseded.
Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.
| Schedule | Schedule QF – Short Term, Cogeneration and Small Power Production - Qualifying Facilities (Electric Tariff No. 1-B, PUCN Sheet Nos. 32 and 32A) Note: The same PDF also carries Schedule QF – Long Term (Sheets 32B-33): a $0.04100 per kWh total rate for 30-year contracts, available only until 250 MW of QF contracts were approved or a new resource plan was approved, with CPI adjustments from May 1, 1991 (sheets issued 02-18-11). It is a closed 1990-era offer, not an open standard rate, and is not used here. NV Energy's QF page names Schedule QF as the pricing for southern Nevada resources. Source: nvenergy.com: QF_South.pdf · also: nvenergy.com: qualifying-facilities · checked 2026-10-04 | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| Docket or order | PUCN Docket No. 24-12006: Advice Letter No. 551, filed 12/09/2024, to revise Schedule QF - Short Term (annual NAC 704.8783 filing) Note: Commission order dated 2/20/25 (vote at the February 11, 2025 general session) grants the application and approves the revised tariff effective April 1, 2025 (scanned; read by eye). The advice letter (scanned; read by eye) says the sheets do not change provisions or rates and that the index method dates from Docket No. 14-07019. The OnBase document link is session-specific and may expire; if so, search the docket number at https://puc-onbase.nv.gov/ (type 'PUC - Public Search - Dockets'). Source: pucweb1.state.nv.us: Dktinfo.aspx?Util=All · also: nvenergy.com: QF_South.pdf, puc-onbase.nv.gov: Adgmn8L3kr2Éz1IpPjVAx0T7chXy6LÉz5xm2aUqh7poRIKK…, puc-onbase.nv.gov: AUuoz5ÉC8EUQZEMZ575jznFmhMlu3vaySUbbh0MqYkÁ7Hwy…, puc-onbase.nv.gov · checked 2026-10-04 | |||||||||
| Effective date | 2025-04-01 Note: Sheets 32 and 32A: Issued 12-09-24, Effective 04-01-25. The PUCN order (scanned; read by eye) approves the tariff effective April 1, 2025. No later Schedule QF filing appears in the PUCN all-dockets list (entries through September 2026), so this is taken as the version in effect on 2026-10-04. Source: nvenergy.com: QF_South.pdf · also: puc-onbase.nv.gov: Adgmn8L3kr2Éz1IpPjVAx0T7chXy6LÉz5xm2aUqh7poRIKK…, pucweb1.state.nv.us: Dktinfo.aspx?Util=All · checked 2026-10-04 | |||||||||
| Next update | Annual, in tariff format: NAC 704.8783 requires each utility to file its short-term avoided costs annually, and within 60 days after the Commission issues an order accepting its resource plan. The tariff says rates continue in effect until superseded. Note: Recent filings: Dockets 22-02011 (Feb 2022), 23-12013 (Dec 2023), 24-12006 (Dec 2024). No 2025 or 2026 filing appears in the PUCN docket list as of 2026-10-04. The joint 2027-2046 IRP (Docket 26-05007, filed 05/07/2026) is pending, so a refiling is expected within 60 days after an order accepting it. NAC 704.8783 asks for $/kWh peak and off-peak costs, but the approved tariff uses hourly indices instead. Source: leg.state.nv.us: NAC-704.html · also: nvenergy.com: QF_South.pdf, pucweb1.state.nv.us: Dktinfo.aspx?Util=All · checked 2026-10-04 | |||||||||
| Size cap | No size cap printed. Applies to short-term purchases from any QF located in the Company's service area where no other schedule specifically applies.Source: nvenergy.com: QF_South.pdf · checked 2026-10-04 | |||||||||
| Resource types | Any QF (cogeneration or small power production); no resource-specific rates. Rates differ only by firm vs non-firm energy.Source: nvenergy.com: QF_South.pdf · checked 2026-10-04 | |||||||||
| Energy rate structure | Hourly market-indexed, all months. Firm energy (on- or off-peak) is paid, each hour, the lesser of the Powerdex Mead/Marketplace and Powerdex California-Oregon Border (COB) hourly index prices. Non-firm energy is paid the lesser of the highest hourly system incremental generation cost or those two hourly index prices. No fixed, seasonal or levelized prices are printed.Source: nvenergy.com: QF_South.pdf · checked 2026-10-04 | |||||||||
| Energy rates (sample cells) |
Copied as printed: a few labelled cells, not the full rate matrix. The whole schedule is linked below. Note: The tariff prints no unit for the hourly index prices; $/MWh follows its fallback clause ('a rate per MWH equal to the average of the applicable hourly prices'). Source: nvenergy.com: QF_South.pdf · checked 2026-10-04 | |||||||||
| Capacity payment | None separate: the capacity cost is included in the firm energy rate.Source: nvenergy.com: QF_South.pdf · checked 2026-10-04 | |||||||||
| Contract terms | The schedule states no contract term. NV Energy's QF page says a Power Purchase Agreement is required for a QF to be paid, and that long-term avoided cost pricing depends on the company's most recently approved IRP filings. Purchases are subject to Tariff Rule No. 15, and the utility accepts all offered purchases, subject to 18 C.F.R. 292.304(f). Note: Public page: https://www.nvenergy.com/about-nvenergy/rates-regulatory/qualifying-facilities (rendered by script; text taken from the site's content feed cited here). The process flowchart says the QF reviews a standard PPA. Source: nvenergy.com: qualifying-facilities · also: nvenergy.com: QF_South.pdf, nvenergy.com: QF-Process-Flowchart-External.pdf · checked 2026-10-04 | |||||||||
| Price fixity | Not fixed: paid at hourly index prices. Energy counts as firm only if backed by firm resources under a firm contract, pre-scheduled, or financially firm with liquidated damages; other energy is paid the non-firm rate.Source: nvenergy.com: QF_South.pdf · checked 2026-10-04 | |||||||||
| Schedule link | https://www.nvenergy.com/publish/content/dam/nvenergy/brochures_arch/about-nvenergy/rates-regulatory/electric-schedules-south/QF_South.pdf Note: The older link https://www.nvenergy.com/company/rates/snv/schedules/images/QF_South.pdf redirects to a host that returned an error on 2026-10-04. Source: nvenergy.com: QF_South.pdf · also: nvenergy.com: qualifying-facilities · checked 2026-10-04 |
Values are copied as printed in the source. Where a value draws on more than one document, every source is listed, primary first.