All utilities › Nevada
The standard-offer rates for small generators (qualifying facilities) published by 2 investor-owned utilities we cover in Nevada: Nevada Power and Sierra Pacific Power. Checked on October 4, 2026.
| Utility | Schedule | Size cap | Rate structure | Effective | Checked on |
|---|---|---|---|---|---|
| Nevada Power | Schedule QF – Short Term, Cogeneration and Small Power Production - Qualifying Facilities (Electric Tariff No. 1-B, PUCN Sheet Nos. 32 and 32A) | No size cap printed. Applies to short-term purchases from any QF located in the Company's service area where no other schedule specifically applies. | Hourly market-indexed, all months. Firm energy (on- or off-peak) is paid, each hour, the lesser of the Powerdex Mead/Marketplace and Powerdex California-Oregon Border (COB) hourly index prices. Non-firm energy is paid the lesser of the highest hourly system incremental generation cost or those two hourly index prices. No fixed, seasonal or levelized prices are printed. | 2025-04-01 | 2026-10-04 |
| Sierra Pacific Power | Schedule No. CSPP, Short-Term Rates Cogeneration and Small Power Production (Electric Tariff No. 2, PUCN Sheet Nos. 2 and 3) | No size cap printed; applies to short-term purchases from QFs where no other schedule specifically applies. QFs of 100 kW nameplate or less may choose time-differentiated or non-time-differentiated rates; QFs over 100 kW must use time-differentiated rates. | Hourly market-indexed, all quarters. Time-differentiated: firm energy is paid, each hour, the lesser of the Powerdex COB and Powerdex Mead/Marketplace hourly index prices; non-firm energy the lesser of the highest hourly system incremental generation cost or those two hourly index prices. Non-time-differentiated (QFs of 100 kW or less only): the average of the firm or non-firm hourly rates for the billing period. No fixed, seasonal or levelized prices are printed. | 2025-04-01 | 2026-10-04 |
Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.