All utilities › Kentucky
The standard-offer rates for small generators (qualifying facilities) published by 4 investor-owned utilities we cover in Kentucky: Duke Energy Kentucky, Kentucky Power, KU (Kentucky Utilities) and Louisville Gas and Electric (LG&E). Checked on October 4, 2026.
| Utility | Schedule | Size cap | Rate structure | Effective | Checked on |
|---|---|---|---|---|---|
| Duke Energy Kentucky | Cogeneration and Small Power Production Sale and Purchase Tariff - 100 kW or Less (KY.P.S.C. Electric No. 2, Ninth Revised Sheet No. 93); identical rates in the Greater Than 100 kW tariff (Tenth Revised Sheet No. 94) | Sheet 93: qualifying facilities of 100 kW or less. Sheet 94 covers facilities greater than 100 kW with the same printed rates; under 807 KAR 5:054 Section 7(4) rates for QFs over 100 kW are the basis for negotiation. | Energy: hourly PJM Real-Time LMP at the DEK Aggregate price node (energy, congestion and losses), converted to $/kWh for each hour of the billing month. Capacity: separate $/kW-month rate by contract start year and contract length. | 2026-05-13 | 2026-10-04 |
| Kentucky Power | Tariff COGEN/SPP (Cogeneration and/or Small Power Production), P.S.C. KY. No. 14, Sheet Nos. 21-1 to 21-4 | PURPA Section 210 QFs: cogeneration facilities with net capacity at or below 20,000 kW; small power production facilities at or below 5,000 kW. | Energy credit at variable LMP at time of delivery (standard meter for all kWh, or time-of-day meter with on-peak 7 a.m.-9 p.m. weekdays and off-peak periods). Separate capacity credit in $/kW-month if the customer contracts for a specified capacity. Options: Option 2 sells excess energy over the customer's load; Option 3 sells total output while buying all load from the company. Monthly metering charges apply. | 2026-03-01 | 2026-10-04 |
| KU (Kentucky Utilities) | Standard Rate Rider SQF, Small Capacity Cogeneration and Small Power Production Qualifying Facilities (Sheet No. 55); Rider LQF (Sheet No. 56) carries the same rates for QFs over 100 kW but they are advisory only | Nameplate capacity of 100 kW or less (Rider SQF). QFs over 100 kW use Rider LQF, where the same rates are only the basis for negotiation (807 KAR 5:054 Section 7(4)). | Flat $/MWh energy rates and separate $/MWh capacity rates by technology, by 2-year or 7-year PPA, and by distribution- or transmission-connected project; no time-of-use or seasonal split. Energy and capacity rates are added to give the All-In Rate. As-available energy (no PPA) is priced on the applicable 2-year PPA rate. | 2026-02-16 | 2026-10-04 |
| Louisville Gas and Electric (LG&E) | Standard Rate Rider SQF, Small Capacity Cogeneration and Small Power Production Qualifying Facilities (Sheet No. 55); Rider LQF (Sheet No. 56) carries the same rates for QFs over 100 kW but they are advisory only | Nameplate capacity of 100 kW or less (Rider SQF). QFs over 100 kW use Rider LQF, where the same rates are only the basis for negotiation (807 KAR 5:054 Section 7(4)). | Flat $/MWh energy rates and separate $/MWh capacity rates by technology, by 2-year or 7-year PPA, and by distribution- or transmission-connected project; no time-of-use or seasonal split. Energy and capacity rates are added to give the All-In Rate. As-available energy (no PPA) is priced on the applicable 2-year PPA rate. | 2026-02-16 | 2026-10-04 |
Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.