by Hundred Dollar Labs

All utilities › Missouri › Evergy Missouri West

Evergy Missouri West, Missouri: PURPA avoided-cost rates

Evergy Missouri West, Inc. d/b/a Evergy Missouri West: what it publishes for small generators (qualifying facilities) under PURPA, field by field, with the source for each. Checked on October 4, 2026.

When this may change: Biennial: 20 CSR 4240-3.155(3) requires cogeneration tariffs and data to be updated and revised on or before January 15 of every odd-numbered year unless the Commission orders otherwise; next filing due by January 15, 2027.

Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.

ScheduleParallel Generation Contract Service (Cogeneration Purchase Schedule), P.S.C. MO. No. 1, Sheets 102, 102.1, 102.2; payment rate on 6th Revised Sheet No. 102.1Source: evergy.com: mo-west-rate.pdf · also: efis.psc.mo.gov: 817135 · checked 2026-10-04
Docket or orderMissouri PSC File No. EE-2025-0211, Tracking No. JE-2025-0117 (2025 biennial parallel generation tariff); Order Granting Request for Waiver and Approving Tariff Sheets issued February 5, 2025

Note: Same joint order as Evergy Missouri Metro (EE-2025-0210); one-time waiver of the January 15 filing deadline.

Source: efis.psc.mo.gov: 817766 · also: efis.psc.mo.gov: 92837, efis.psc.mo.gov: 814892 · checked 2026-10-04
Effective date2025-02-21Source: efis.psc.mo.gov: 817135 · also: efis.psc.mo.gov: 817766, evergy.com: mo-west-rate.pdf · checked 2026-10-04
Next updateBiennial: 20 CSR 4240-3.155(3) requires cogeneration tariffs and data to be updated and revised on or before January 15 of every odd-numbered year unless the Commission orders otherwise; next filing due by January 15, 2027.Source: sos.mo.gov: 20c4240-3.pdf · also: efis.psc.mo.gov: 814892 · checked 2026-10-04
Size capNot applicable where the Customer's maximum capacity exceeds 100 kW; service at one point of delivery with the generator operating in parallel. Not available for Resale or Time-Related Pricing service.Source: evergy.com: mo-west-rate.pdf · checked 2026-10-04
Resource typesAny Qualifying Facility (cogeneration or small power production facility as defined in Subpart B of PURPA); single rate for all technologies.Source: evergy.com: mo-west-rate.pdf · checked 2026-10-04
Energy rate structureSingle flat payment rate per kWh for all kWh received; no seasonal or time-of-day differentiation. Energy delivered to the Customer is billed under the applicable Residential or General Service schedule.Source: efis.psc.mo.gov: 817135 · also: evergy.com: mo-west-rate.pdf · checked 2026-10-04
Energy rates (sample cells)
Cell (as labelled, with vintage)RateUnits
Payment rate, all kWh received (flat, all hours and seasons)$0.0198$ per kWh

Copied as printed: a few labelled cells, not the full rate matrix. The whole schedule is linked below.

Source: efis.psc.mo.gov: 817135 · also: evergy.com: mo-west-rate.pdf · checked 2026-10-04
Capacity paymentNone separate: the single payment rate is described as reflecting the net value to the Company of energy delivered.Source: efis.psc.mo.gov: 817135 · checked 2026-10-04
Contract termsA special contract is required for technical and safety conditions of parallel generation. No contract length is printed. Company may require the Customer to limit output to no more than the load at the Customer's facility.Source: evergy.com: mo-west-rate.pdf · checked 2026-10-04
Price fixityVariable: tariff payment rate revised every two years under 20 CSR 4240-3.155; service is subject to rules in effect during the term; no fixed-price term is printed.Source: evergy.com: mo-west-rate.pdf · also: sos.mo.gov: 20c4240-3.pdf · checked 2026-10-04
Schedule linkhttps://www.evergy.com/-/media/documents/billing/missouri/detailed_tariffs_mo/mo-west/mo-west-rate.pdf

Note: Compiled rate book; Schedule PG is on Sheets 102-102.2. Approved Sheet 102.1 as substituted on EFIS: https://efis.psc.mo.gov/Document/Display/817135

Source: evergy.com: mo-west-rate.pdf · also: efis.psc.mo.gov: 817135 · checked 2026-10-04

Values are copied as printed in the source. Where a value draws on more than one document, every source is listed, primary first.

Also in Missouri: Ameren Missouri, Evergy Missouri Metro, Liberty (Empire). All 59 utilities. Get every utility as CSV/JSON.