Evergy Metro, Inc. d/b/a Evergy Missouri Metro: what it publishes for small generators (qualifying facilities) under PURPA, field by field, with the source for each. Checked on October 4, 2026.
When this may change: Biennial: 20 CSR 4240-3.155(3) requires cogeneration tariffs and data to be updated and revised on or before January 15 of every odd-numbered year unless the Commission orders otherwise; next filing due by January 15, 2027.
Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.
| Schedule | Parallel Generation Contract Service, Schedule PG (P.S.C. MO. No. 7, Sheets 31, 31A, 31B); payment rate on 16th Revised Sheet No. 31ASource: evergy.com: parallel-generation-contract-service.pdf · also: evergy.com: mo-metro-rate.pdf · checked 2026-10-04 | ||||||
|---|---|---|---|---|---|---|---|
| Docket or order | Missouri PSC File No. EE-2025-0210, Tracking No. JE-2025-0116 (2025 biennial parallel generation tariff); Order Granting Request for Waiver and Approving Tariff Sheets issued February 5, 2025 Note: Evergy filed after the January 15 deadline; the Commission granted a one-time waiver of 20 CSR 4240-3.155(3). Source: efis.psc.mo.gov: 817764 · also: efis.psc.mo.gov: 92836, efis.psc.mo.gov: 814887 · checked 2026-10-04 | ||||||
| Effective date | 2025-02-21Source: evergy.com: parallel-generation-contract-service.pdf · also: efis.psc.mo.gov: 817764 · checked 2026-10-04 | ||||||
| Next update | Biennial: 20 CSR 4240-3.155(3) requires cogeneration tariffs and data to be updated and revised on or before January 15 of every odd-numbered year unless the Commission orders otherwise; next filing due by January 15, 2027.Source: sos.mo.gov: 20c4240-3.pdf · also: efis.psc.mo.gov: 814887 · checked 2026-10-04 | ||||||
| Size cap | Not applicable where the Customer's maximum capacity exceeds 100 kW; service at one point of delivery with the generator operating in parallel with the Company's system. Not available for Resale or Time-Related Pricing service. Note: The current Sheet 31 is the 1st Revised sheet effective January 2023. A revised tariff book issued February 6, 2026 (proposed effective March 8, 2026; EFIS document 865459) re-issues Sheet 31 as 2nd Revised with the same 100 kW limit; Evergy's compiled tariff book on its website (last modified August 2026) still shows the 1st Revised Sheet 31 and 16th Revised Sheet 31A. Source: evergy.com: parallel-generation-contract-service.pdf · also: efis.psc.mo.gov: 865459, evergy.com: mo-metro-rate.pdf · checked 2026-10-04 | ||||||
| Resource types | Any Qualifying Facility (cogeneration or small power production facility as defined in Subpart B of PURPA); single rate for all technologies.Source: evergy.com: parallel-generation-contract-service.pdf · checked 2026-10-04 | ||||||
| Energy rate structure | Single flat payment rate per kWh for all kWh received; no seasonal or time-of-day differentiation. Energy delivered to the Customer is billed under the applicable Residential or General Service schedule.Source: evergy.com: parallel-generation-contract-service.pdf · checked 2026-10-04 | ||||||
| Energy rates (sample cells) |
Copied as printed: a few labelled cells, not the full rate matrix. The whole schedule is linked below. Source: evergy.com: parallel-generation-contract-service.pdf · also: efis.psc.mo.gov: 817131 · checked 2026-10-04 | ||||||
| Capacity payment | None separate: the single payment rate is described as reflecting the net value to the Company of energy delivered.Source: evergy.com: parallel-generation-contract-service.pdf · checked 2026-10-04 | ||||||
| Contract terms | Customer contracts for service under Schedule PG; a special contract is required for technical and safety conditions of parallel generation. No contract length is printed. Company may require the Customer to limit output to no more than the load at the Customer's facility.Source: evergy.com: parallel-generation-contract-service.pdf · checked 2026-10-04 | ||||||
| Price fixity | Variable: tariff payment rate revised every two years under 20 CSR 4240-3.155; service is subject to rules in effect during the term; no fixed-price term is printed.Source: evergy.com: parallel-generation-contract-service.pdf · also: sos.mo.gov: 20c4240-3.pdf · checked 2026-10-04 | ||||||
| Schedule link | https://www.evergy.com/-/media/documents/billing/missouri/detailed_tariffs_mo/parallel-generation-contract-service.pdf Note: Approved Sheet 31A as substituted on EFIS: https://efis.psc.mo.gov/Document/Display/817131 Source: evergy.com: parallel-generation-contract-service.pdf · also: efis.psc.mo.gov: 817131 · checked 2026-10-04 |
Values are copied as printed in the source. Where a value draws on more than one document, every source is listed, primary first.
Also in Missouri: Ameren Missouri, Evergy Missouri West, Liberty (Empire). All 59 utilities. Get every utility as CSV/JSON.