Public Service Company of New Mexico: what it publishes for small generators (qualifying facilities) under PURPA, field by field, with the source for each. Checked on October 4, 2026.
When this may change: Not stated in the source. unverified
Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.
| Schedule | 56th Revised Rate No. 12, Cogeneration and Small Power Production Facilities (canceling 55th Revised Rate No. 12) Note: PNM's table of contents filed with Advice Notice No. 662 (effective September 2, 2026 per its file name) still lists the 56th Revised Rate No. 12 as current. Source: pnm.com: pnm-an-649-effective-march-1-2026-1 · also: pnm.com: pnm-an-662-effective-sptember-2-2026-table-of-c… · checked 2026-10-04 | ||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Docket or order | PNM Advice Notice No. 649 (pages 10-12 marked Second Amended Advice Notice No. 649); no NMPRC case number or approval date is printed on the sheets Note: The NMPRC docket entry for Advice Notice No. 649 was not located; approval status is taken from PNM posting it as the current Rate No. 12. Source: pnm.com: pnm-an-649-effective-march-1-2026-1 · checked 2026-10-04 | ||||||||||||||||||
| Effective date | 2026-03-01 Unverified. We could not fully confirm this from a primary document; see the note. Check the source before using it. Note: Not printed on the rate sheets. Date taken from PNM's own document URL slug 'pnm-an-649-effective-march-1-2026'; PDF metadata shows creation on Feb 27, 2026. Source: pnm.com: pnm-an-649-effective-march-1-2026-1 · checked 2026-10-04 | ||||||||||||||||||
| Next update | Not stated in the source. Unverified. We could not fully confirm this from a primary document; see the note. Check the source before using it. Note: Rate No. 12 states no update cycle. Its rates are built from the preceding calendar year's ELAP prices, which implies a yearly refiling (current table under Advice Notice No. 649). The annual-update sentence in 17.9.570.11(C) NMAC applies to schedules filed before a utility's method tariff is approved under 17.9.570.11(B)(1), so it may not govern PNM's current method. Source: pnm.com: pnm-an-649-effective-march-1-2026-1 · also: srca.nm.gov: 17.009.0570.pdf · checked 2026-10-04 | ||||||||||||||||||
| Size cap | Published monthly rate tables: QFs rated 5 MW and below. QFs above 5 MW are paid hourly ELAP prices times a loss factor. QFs rated 10 kW or less: Rule 570.14 (net metering) provisions apply.Source: pnm.com: pnm-an-649-effective-march-1-2026-1 · checked 2026-10-04 | ||||||||||||||||||
| Resource types | Any qualifying cogeneration or small power production facility (18 CFR 292.201-292.207); a separate rate column applies to solar energy production facilities.Source: pnm.com: pnm-an-649-effective-march-1-2026-1 · checked 2026-10-04 | ||||||||||||||||||
| Energy rate structure | QFs 5 MW and below: a 12-month table (March through February) of per-kWh energy rates by interconnection voltage (secondary, primary, substation, sub-transmission, transmission) and costing period matching the QF's retail schedule (TOU on/off-peak, RTOD/TOD on/off-peak, TOD super off-peak, non-TOU); a separate solar 'All Daylight Hours' rate at primary voltage. Some printed values are negative (shown in parentheses); rates applied to bills are not less than $0.00/kWh. QFs above 5 MW: actual hourly production x hourly ELAP price x voltage loss factor.Source: pnm.com: pnm-an-649-effective-march-1-2026-1 · checked 2026-10-04 | ||||||||||||||||||
| Energy rates (sample cells) |
Copied as printed: a few labelled cells, not the full rate matrix. The whole schedule is linked below. Note: Month rows run March through February in the Advice Notice No. 649 tables (taken to be March 2026-February 2027; the sheets print no year). Secondary rows from page 3 (columns: TOU On-Peak, TOU Off-Peak, RTOD On-Peak, RTOD Off-Peak, Non-TOU/TOD); solar row from page 6; transmission row from page 9 (columns: TOU On-Peak, TOU Off-Peak, TOD On-Peak, TOD Off-Peak, TOD Super Off-Peak). Source: pnm.com: pnm-an-649-effective-march-1-2026-1 · checked 2026-10-04 | ||||||||||||||||||
| Capacity payment | None stated: Rate No. 12 sets energy purchase rates only.Source: pnm.com: pnm-an-649-effective-march-1-2026-1 · checked 2026-10-04 | ||||||||||||||||||
| Contract terms | No contract term or standard purchase agreement in Rate No. 12. Service starts after an Application for Interconnection, an executed Interconnection Agreement, completion of 17.9.570.9(B)(1)-(7) NMAC requirements and interconnection. Monthly statement nets charges and credits; payment made to the QF if it is owed more.Source: pnm.com: pnm-an-649-effective-march-1-2026-1 · checked 2026-10-04 | ||||||||||||||||||
| Price fixity | Variable: a fixed monthly table for the filing period, recalculated from the preceding calendar year's monthly ELAP averages; QFs above 5 MW paid hourly market prices.Source: pnm.com: pnm-an-649-effective-march-1-2026-1 · checked 2026-10-04 | ||||||||||||||||||
| Schedule link | https://www.pnm.com/documents/d/pnm.com/pnm-an-649-effective-march-1-2026-1Source: pnm.com: pnm-an-649-effective-march-1-2026-1 · checked 2026-10-04 |
Values are copied as printed in the source. Where a value draws on more than one document, every source is listed, primary first.
Also in New Mexico: El Paso Electric, Xcel Energy (SPS). All 59 utilities. Get every utility as CSV/JSON.