by Hundred Dollar Labs

All utilities › Kansas

Kansas PURPA avoided-cost rates

The standard-offer rates for small generators (qualifying facilities) published by 3 investor-owned utilities we cover in Kansas: Evergy Kansas Central, Evergy Kansas Metro and Liberty (Empire) Kansas. Checked on October 4, 2026.

UtilityScheduleSize capRate structureEffectiveChecked on
Evergy Kansas CentralSchedule PGR, Parallel Generation Rider (Kansas statutory parallel generation purchase under K.S.A. 66-1,184; separate from Net Metering Rider NMR)150% tier: residential generators 25 kW or less and commercial, industrial and school generators 200 kW or less; 100% tier: anything larger. Generator must be sized to the customer's load (formula in Condition 11); no upper size limit printed. Statute caps aggregate parallel generation plus net metering export capacity at 7% of historic peak demand from July 1, 2026 (8% from July 1, 2027).Single per-kWh payment for exported energy: 150% (small) or 100% (large) of the monthly system average cost of energy, computed each month as (F + P + E + EC - NRCA) / (.01 x S) from fuel, purchased power, emissions and environmental-credit costs over retail requirements kWh. No time-of-day or seasonal differentiation.2025-01-082026-10-04
Evergy Kansas MetroSchedule PG, Parallel Generation Contract Service (Kansas statutory parallel generation purchase under K.S.A. 66-1,184)150% tier: residential generators 25 kW or less and commercial, industrial and school generators 200 kW or less; 100% tier: anything larger. Generator must be sized to the customer's load (Condition 11); no upper size limit printed. Statute caps aggregate parallel generation plus net metering export capacity at 7% of historic peak demand from July 1, 2026.Single per-kWh payment for exported energy: 150% (small) or 100% (large) of the monthly system average cost of energy, computed each month as (F + P + E + EC + T - OSSR) / S from Evergy Metro fuel, purchased power, emissions, environmental-credit and transmission costs net of off-system sales, over kWh delivered to all Evergy Metro customers. No time-of-day or seasonal differentiation.2025-01-082026-10-04
Liberty (Empire) KansasSchedule PGS, Parallel Generation Service (K.C.C. Index No. 4)Standard 150% rate: residential systems less than 25 kW and non-residential systems less than 100 kW. Residential 25 kW to less than 100 kW: negotiated price based on avoided energy cost. Over 100 kW: negotiated under PURPA.Single per-kWh payment of 150 percent of the average system cost of energy for small systems; negotiated avoided-energy-cost price for residential 25-100 kW; no time-of-day or seasonal differentiation. The tariff does not define how the average system cost of energy is computed or how often it is updated.2004-05-24 unverified2026-10-04

When these rates change next

Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.