DTE Electric, Michigan: PURPA avoided-cost rates

DTE Electric Company: what it publishes for small generators (qualifying facilities) under PURPA, field by field, with the source for each. Checked on October 4, 2026.

When this may change: Five-year on-peak/off-peak MISO LMP forecast 'will be updated annually by the Company'; capacity-need LCOE rate also 'will be updated annually'. (MCL 460.6v also requires MPSC PURPA reevaluation at least every 5 years.)

Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.

ScheduleStandard Contract Rider No. 5 - Small Power Production and Cogeneration Facilities (M.P.S.C. No. 1 - Electric, Sheets D-78.00 to D-82.00)Source: michigan.gov: dtee1cur.pdf · checked 2026-10-04
Docket or orderMPSC Case No. U-18091, order dated August 22, 2024 (sheets D-79.00 and D-82.00 reissued January 23, 2026 under that authority with updated LMP forecast)Source: michigan.gov: dtee1cur.pdf · checked 2026-10-04
Effective date2026-02-01

Note: Sheets D-79.00 and D-82.00 (current LMP forecast table) effective for service on and after February 1, 2026; sheets D-80.00/D-81.00 effective August 22, 2024.

Source: michigan.gov: dtee1cur.pdf · checked 2026-10-04
Next updateFive-year on-peak/off-peak MISO LMP forecast 'will be updated annually by the Company'; capacity-need LCOE rate also 'will be updated annually'. (MCL 460.6v also requires MPSC PURPA reevaluation at least every 5 years.)Source: michigan.gov: dtee1cur.pdf · checked 2026-10-04
Size capRider available to on-site small power production 5 MW and smaller or cogeneration 20 MW and smaller; the Standard Offer applies to QFs less than or equal to 550 kW (above 550 kW: negotiated agreement).Source: michigan.gov: dtee1cur.pdf · checked 2026-10-04
Resource typesAny facility with FERC QF status (small power production or cogeneration); not resource-specific. The capacity-need standard offer rate is benchmarked to solar generation LCOE.Source: michigan.gov: dtee1cur.pdf · checked 2026-10-04
Energy rate structureDTE currently states it has no capacity need, so the 'No Capacity Need' standard offer applies: energy paid at actual day-ahead MISO hourly LMP at the DTE load node for the life of the contract, OR a five-year fixed on-peak/off-peak annual LMP forecast table (by year) followed by actual day-ahead LMP for the rest of the term. A one mill/kWh administrative charge applies.Source: michigan.gov: dtee1cur.pdf · checked 2026-10-04
Energy rates (sample cells)
Cell (as labelled, with vintage)RateUnits
No Capacity Need standard offer, Average Annual LMP Forecast, year 2026 On-Peak (optional 5-year fixed)55.41$/MWh
No Capacity Need standard offer, Average Annual LMP Forecast, year 2026 Off-Peak (optional 5-year fixed)39.40$/MWh
No Capacity Need standard offer, Average Annual LMP Forecast, year 2027 On-Peak53.04$/MWh
No Capacity Need standard offer, Average Annual LMP Forecast, year 2027 Off-Peak39.07$/MWh

Copied as printed: a few labelled cells, not the full rate matrix. The whole schedule is linked below.

Source: michigan.gov: dtee1cur.pdf · checked 2026-10-04
Capacity paymentNone currently: tariff states 'The Company does not have a capacity need at this time.' If a capacity need arises, the standard offer becomes a bundled capacity-and-energy rate at the all-in solar LCOE of $79 per MWh (updated annually); for short-term/intermittent need, capacity is priced from MISO's Zone 7 Planning Resource Auction.Source: michigan.gov: dtee1cur.pdf · checked 2026-10-04
Contract terms5, 10, 15 or 20 years (No Capacity Need and Capacity Need standard offers); up to 5 years for the short-term/intermittent capacity-need offer.Source: michigan.gov: dtee1cur.pdf · checked 2026-10-04
Price fixityOptional fixed energy price for the first 5 years only (annual LMP forecast table); any period after year 5 is at actual day-ahead MISO LMP. Alternatively variable LMP for the whole term.Source: michigan.gov: dtee1cur.pdf · checked 2026-10-04
Schedule linkhttps://www.michigan.gov/mpsc/-/media/Project/Websites/mpsc/consumer/rate-books/electric/dte/dtee1cur.pdfSource: michigan.gov: dtee1cur.pdf · checked 2026-10-04

Values are copied as printed in the source. Where a value draws on more than one document, every source is listed, primary first.

Also in Michigan: Consumers Energy, Indiana Michigan Power, Upper Peninsula Power (UPPCO). All 59 utilities. Get every utility as CSV/JSON.