All utilities › Virginia › Dominion Energy Virginia
Virginia Electric and Power Company: what it publishes for small generators (qualifying facilities) under PURPA, field by field, with the source for each. Checked on October 4, 2026.
When this may change: No fixed refiling cycle stated. The tariff says its provisions and rates are 'subject to modification at any time in the manner prescribed by law'; energy and capacity prices are indexed to PJM and change with the market.
Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.
| Schedule | Schedule 19, Power Purchases from Cogeneration and Small Power Production Qualifying FacilitiesSource: cdn-dominionenergy-prd-001.azureedge.net: schedule-19.pdf · also: cdn-dominionenergy-prd-001.azureedge.net: entire-filed-tariff.pdf · checked 2026-10-04 | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| Docket or order | Schedule 19 revised (small power producer cap cut from 20,000 kW to 5,000 kW after FERC Order No. 872) in SCC Case No. PUR-2021-00220 (Final Order December 9, 2021; effective for usage on and after September 15, 2021). Current sheets (filed 12-20-22, effective 01-01-24) were accepted for filing by SCC Staff on June 27, 2023 in the 2021 triennial review, Case No. PUR-2021-00058 (Final Order November 18, 2021). The avoided cost methodology itself dates to Case No. PUE-2008-00078 (Final Order May 18, 2010). Note: The tariff sheet itself prints no case number; case numbers come from the SCC Staff acceptance letters and the PUR-2021-00220 application. Not confirmed in which case the PJM LMP-based energy pricing was first adopted. Source: scc.virginia.gov: 364331 · also: scc.virginia.gov: 364332, scc.virginia.gov: 294590, scc.virginia.gov: 262602, cdn-dominionenergy-prd-001.azureedge.net: schedule-19.pdf · checked 2026-10-04 | |||||||||
| Effective date | 2024-01-01 Note: Sheets read 'Filed 12-20-22 ... This Filing Effective For Usage On and After 01-01-24'. The Dominion entire filed tariff table of contents (filing dated 12-09-25, effective 01-01-26) still lists Schedule 19 at 01-01-24, so no later revision was found. Source: cdn-dominionenergy-prd-001.azureedge.net: schedule-19.pdf · also: cdn-dominionenergy-prd-001.azureedge.net: entire-filed-tariff.pdf · checked 2026-10-04 | |||||||||
| Next update | No fixed refiling cycle stated. The tariff says its provisions and rates are 'subject to modification at any time in the manner prescribed by law'; energy and capacity prices are indexed to PJM and change with the market. Note: No Virginia rule requiring periodic avoided-cost refilings was found; Schedule 19 has been changed through specific SCC cases and Dominion's base-rate reviews. Source: cdn-dominionenergy-prd-001.azureedge.net: schedule-19.pdf · checked 2026-10-04 | |||||||||
| Size cap | Cogenerators with net capacity of 20,000 kW or less; small power producers with net capacity of 5,000 kW or less. Energy-only option only for QFs of 10 kW or less. Developers may not site Schedule 19 facilities within one-half mile of each other unless an exception applies (e.g. renewable resources with siting limits). Available to QFs reaching commercial operation on or after September 15, 2021. Note: The 5,000 kW small power cap follows FERC's June 16, 2021 letter order ending Dominion's purchase obligation for small power QFs above 5 MW in PJM (Case PUR-2021-00220 application). Source: cdn-dominionenergy-prd-001.azureedge.net: schedule-19.pdf · also: scc.virginia.gov: 262602 · checked 2026-10-04 | |||||||||
| Resource types | Any PURPA cogenerator or small power producer QF; no separate prices by resource type. Renewable resources with geographic siting limits (hydro, solar, wind) are exempt from the one-half mile separation rule.Source: cdn-dominionenergy-prd-001.azureedge.net: schedule-19.pdf · checked 2026-10-04 | |||||||||
| Energy rate structure | Market-indexed. Energy-and-capacity QFs: hourly price in cents per kWh equal to the hourly PJM Dom Zone day-ahead LMP ($/MWh) divided by 10, times hourly net generation. Energy-only QFs (10 kW or less): monthly average of the hourly Dom Zone DA LMP divided by 10. All energy prices increased by 2.8% for avoided line losses (or a site-specific study at the QF's cost), fixed for the contract term. Monthly meter reading and processing charge billed to the QF: $6.56 (one non-time differentiated meter), $76.73 (one time differentiated meter), $120.96 (two time differentiated meters).Source: cdn-dominionenergy-prd-001.azureedge.net: schedule-19.pdf · checked 2026-10-04 | |||||||||
| Energy rates (sample cells) |
Copied as printed: a few labelled cells, not the full rate matrix. The whole schedule is linked below. Note: The tariff converts the $/MWh LMP to cents per kWh by dividing by 10; no numeric energy price is printed. Source: cdn-dominionenergy-prd-001.azureedge.net: schedule-19.pdf · checked 2026-10-04 | |||||||||
| Capacity payment | Energy-and-capacity QFs only: daily on-peak capacity price (cents per kWh) = PJM RPM Base Residual Auction clearing price for the Dom Zone ($/MW-day) divided by 16 hours and by 10, applied to the QF's daily net on-peak generation (on-peak 7 AM to 11 PM every day). Monthly payment is multiplied by a Summer Peak Performance Factor (0 to 1) = number of the 5 PJM summer coincident peak hours in which the QF produced at least 75% of its net capacity, divided by 5. Energy-only QFs get no capacity payment.Source: cdn-dominionenergy-prd-001.azureedge.net: schedule-19.pdf · checked 2026-10-04 | |||||||||
| Contract terms | Written Agreement with the Company; term mutually agreed, not less than one year. QF pays interconnection costs (lump sum or monthly charge) and removal costs; the Company may curtail during minimum load conditions up to 1,000 off-peak hours per calendar year.Source: cdn-dominionenergy-prd-001.azureedge.net: schedule-19.pdf · checked 2026-10-04 | |||||||||
| Price fixity | Variable: energy and capacity prices follow PJM day-ahead LMP and RPM capacity prices. Only the 2.8% line loss percentage is fixed for the contract term. The tariff says payments to QFs with fixed-term contracts at payments set when the obligation is incurred stay at their contract levels.Source: cdn-dominionenergy-prd-001.azureedge.net: schedule-19.pdf · checked 2026-10-04 | |||||||||
| Schedule link | https://cdn-dominionenergy-prd-001.azureedge.net/-/media/content/rates-and-tariffs/pdfs/virginia/large-business/schedule-19.pdfSource: cdn-dominionenergy-prd-001.azureedge.net: schedule-19.pdf · also: cdn-dominionenergy-prd-001.azureedge.net: entire-filed-tariff.pdf · checked 2026-10-04 |
Values are copied as printed in the source. Where a value draws on more than one document, every source is listed, primary first.
Also in Virginia: Appalachian Power. All 59 utilities. Get every utility as CSV/JSON.