by Hundred Dollar Labs

All utilities › South Carolina

South Carolina PURPA avoided-cost rates

The standard-offer rates for small generators (qualifying facilities) published by 3 investor-owned utilities we cover in South Carolina: Dominion Energy South Carolina, Duke Energy Carolinas and Duke Energy Progress. Checked on October 4, 2026.

UtilityScheduleSize capRate structureEffectiveChecked on
Dominion Energy South CarolinaRate PR - Standard Offer, for Small Power Producers of 2 MW or Less under PURPA and S.C. Act No. 62 of 2019Power production capacity less than or equal to 2 MW (PPA: combined with affiliate QFs within one mile, up to 2 MW-AC)Seasonal time-of-use energy credits ($/kWh) for Winter, Shoulder and Summer with 3-4 hour blocks each, stated separately for 2026-2030 and 2031-2035 periodsfirst billing cycle of January 20262026-10-04
Duke Energy CarolinasSchedule PP, Purchased Power (SC Eleventh Revised Leaf No. 90)Contract Capacity of 2 MW or less (nameplate), per S.C. Act 62 standard offer definition (up to 2 MW AC)Time-of-use energy credits (cents/kWh) by season with on-peak, premium-peak and off-peak periods; columns for Two-Year Fixed Rate, Fixed Long-Term 5 years and 10 years, each for distribution vs transmission interconnection. Hourly As-Available Rates also offered.2025-03-032026-10-04
Duke Energy ProgressPurchased Power Schedule PP (SC Second Revised Leaf No. 590; listed on SC e-Tariff as 'Purchased Power Schedule PP-2')Contract Capacity of 2 MW or less (nameplate)Time-of-use energy credits (cents/kWh) by season with on-peak, premium-peak and off-peak periods; columns for Two-Year Fixed, Fixed Long-Term 5 years and 10 years, distribution vs transmission. Hourly As-Available Rates also offered.2026-02-012026-10-04

When these rates change next

Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.