All utilities › Washington › Pacific Power (PacifiCorp)
PacifiCorp (Pacific Power & Light Company): what it publishes for small generators (qualifying facilities) under PURPA, field by field, with the source for each. Checked on October 4, 2026.
When this may change: Annual: each utility must file an updated schedule of estimated avoided costs by November 1 (WAC 480-106-040(1)). The 2025 filings took effect 2026-01-01, so the next filing is due by 2026-11-01, normally for 2027-01-01 rates.
Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.
| Schedule | Schedule QF, Avoided Cost Purchases and Procedures for Qualifying Facilities (Tariff WN U-76). PacifiCorp's Washington QF tariff is Schedule QF, not Schedule 37.Source: pacificpower.net: QF_Avoided_Cost_Purchases_and_Procedures_for_Qu… · checked 2026-10-04 | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Docket or order | WUTC Docket UE-250847 (Advice No. 25-10, filed 2025-10-31), allowed to take effect on the 2025-12-11 No Action Agenda. The schedule framework dates from Docket UE-191024.Source: utc.wa.gov: 250847 · also: pacificpower.net: QF_Avoided_Cost_Purchases_and_Procedures_for_Qu… · checked 2026-10-04 | |||||||||||||||||||||
| Effective date | 2026-01-01Source: pacificpower.net: QF_Avoided_Cost_Purchases_and_Procedures_for_Qu… · also: utc.wa.gov: 250847 · checked 2026-10-04 | |||||||||||||||||||||
| Next update | Annual: each utility must file an updated schedule of estimated avoided costs by November 1 (WAC 480-106-040(1)). The 2025 filings took effect 2026-01-01, so the next filing is due by 2026-11-01, normally for 2027-01-01 rates. Note: The 2027-01-01 effective date is the past pattern, not a rule. Source: app.leg.wa.gov: default.aspx?cite=480-106-040 · checked 2026-10-04 | |||||||||||||||||||||
| Size cap | 5 MW nameplate or less ('Standard QFs'). Larger QFs negotiate under the non-standard methodology.Source: pacificpower.net: QF_Avoided_Cost_Purchases_and_Procedures_for_Qu… · checked 2026-10-04 | |||||||||||||||||||||
| Resource types | Baseload (an Eligible Renewable Resource that is not solar or wind), Wind, Fixed Tilt Solar, and Tracking Solar. Non-renewable QFs lose the Clean Energy Premium.Source: pacificpower.net: QF_Avoided_Cost_Purchases_and_Procedures_for_Qu… · checked 2026-10-04 | |||||||||||||||||||||
| Energy rate structure | Seasonal time-of-use. Table A gives combined energy and capacity contract prices in $/MWh by year, with four periods: On-Peak Winter (6-8 a.m. and 5-11 p.m. PPT, October-May), Off-Peak Winter, On-Peak Summer (2-10 p.m. PPT, June-September) and Off-Peak Summer. It also shows an illustrative weighted average and a Clean Energy Premium column. Tables B, C and D give the energy, capacity and integration components. Prices are net of integration charges for in-BAA QFs. Firm and non-firm (85%) market-index options are also offered.Source: pacificpower.net: QF_Avoided_Cost_Purchases_and_Procedures_for_Qu… · checked 2026-10-04 | |||||||||||||||||||||
| Energy rates (sample cells) |
Copied as printed: a few labelled cells, not the full rate matrix. The whole schedule is linked below. Note: Column order in Table A (Baseload): (a) weighted average, (b) On-Peak Winter, (c) Off-Peak Winter, (d) On-Peak Summer, (e) Off-Peak Summer. Source: pacificpower.net: QF_Avoided_Cost_Purchases_and_Procedures_for_Qu… · checked 2026-10-04 | |||||||||||||||||||||
| Capacity payment | Bundled into Table A prices. Table C gives the components: levelized avoided capacity cost of $157,935/MW-yr for 2026 at 100% capacity contribution, and a Clean Energy Premium of ($16.27)/MWh for 2026. Capacity contributions are Wind 9.70% (winter) and 40.13% (summer), Fixed Tilt Solar 0.09% and 5.21%, Tracking Solar 0.03% and 15.32%, Baseload 100%. The Clean Energy Premium is $0.00 in Table A, and from 2029 PacifiCorp receives the RECs.Source: pacificpower.net: QF_Avoided_Cost_Purchases_and_Procedures_for_Qu… · checked 2026-10-04 | |||||||||||||||||||||
| Contract terms | New QFs: up to 15 years from PPA execution, or 12 years from the scheduled on-line date. Existing QFs: 10 years from first delivery. RCW 80.80.040 non-compliant QFs: less than 5 years.Source: pacificpower.net: QF_Avoided_Cost_Purchases_and_Procedures_for_Qu… · checked 2026-10-04 | |||||||||||||||||||||
| Price fixity | Fixed avoided cost prices are set at PPA execution and do not change during the PPA term. Market-index options are priced at the time of delivery instead.Source: pacificpower.net: QF_Avoided_Cost_Purchases_and_Procedures_for_Qu… · checked 2026-10-04 | |||||||||||||||||||||
| Schedule link | https://www.pacificpower.net/content/dam/pcorp/documents/en/pacificpower/rates-regulation/washington/rates/QF_Avoided_Cost_Purchases_and_Procedures_for_Qualifying_Facilities.pdfSource: pacificpower.net: QF_Avoided_Cost_Purchases_and_Procedures_for_Qu… · checked 2026-10-04 |
Values are copied as printed in the source. Where a value draws on more than one document, every source is listed, primary first.