Idaho Power Company: what it publishes for small generators (qualifying facilities) under PURPA, field by field, with the source for each. Checked on October 4, 2026.
When this may change: No date fixed. The May 1, 2026 annual update (OAR 860-029-0085(4)(a)) was waived by Order No. 26-149. Replacement rates under the new UM 2000 methodology (Order No. 26-021) were filed 2026-05-22 in Docket UM 2436 and are pending: Staff moved the item to the 2026-10-27 public meeting and recommends ordering supplemental filings within a week of that meeting. Rule baseline: May 1 annual update plus a post-IRP-acknowledgement update; ORS 758.525 requires a filing at least every two years.
Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.
| Schedule | Schedule 85, Cogeneration and Small Power Production Standard Contract Rates (Oregon)Source: docs.idahopower.com: 85.pdf · also: edocs.puc.state.or.us: um1730hau344536038.pdf · checked 2026-10-04 | |||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Docket or order | OPUC Docket UM 1730(14), the post-2025-IRP-acknowledgement update approved by Order No. 26-079 (entered 2026-03-17). The filing was first suspended by Order No. 26-033. Order No. 26-149 waived the May 1, 2026 update.Source: apps.puc.state.or.us: 26-079.pdf · also: apps.puc.state.or.us: 26-149.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Effective date | 2026-03-18 Note: The tariff sheets 85-8 to 85-11 say 'Effective on March 18, 2026', while Staff's report lists an effective date of March 17, 2026 (the order date). Source: docs.idahopower.com: 85.pdf · also: edocs.puc.state.or.us: um1730hau344536038.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Next update | No date fixed. The May 1, 2026 annual update (OAR 860-029-0085(4)(a)) was waived by Order No. 26-149. Replacement rates under the new UM 2000 methodology (Order No. 26-021) were filed 2026-05-22 in Docket UM 2436 and are pending: Staff moved the item to the 2026-10-27 public meeting and recommends ordering supplemental filings within a week of that meeting. Rule baseline: May 1 annual update plus a post-IRP-acknowledgement update; ORS 758.525 requires a filing at least every two years. Note: The new rates (6x6 block pricing, capacity ramp-in, RFP-based capacity values) will replace these legacy schedules when approved; the Staff report gives UM 2436 proposed 15-yr levelized prices that differ a lot from current ones. Source: edocs.puc.state.or.us: um2436hah349624029.pdf · also: edocs.puc.state.or.us: um1728hau345724110.pdf, edocs.puc.state.or.us: um2436hau349609029.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Size cap | 10 MW AC nameplate for standalone solar, solar+storage (combined) and non-solar QFs. Interim solar+storage prices are limited to a 50 MW AC system cap. On-system QFs must take NRIS, and QFs taking ERIS need a Non-Standard Contract.Source: docs.idahopower.com: 85.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Resource types | Separate price tables for Baseload, Wind, PV Solar, and Solar and Storage (interim). There are no separate renewable and non-renewable tables.Source: docs.idahopower.com: 85.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Energy rate structure | Annual On-Peak and Off-Peak $/MWh prices by year from 2026 to 2050, multiplied by a monthly Seasonality Factor: 73.50% in March-May; 120.00% in July, August, November and December; 100.00% in other months. On-Peak is HE 0700-2200 Mountain Time excluding Sundays and holidays (16 hours). Wind and solar prices are shown net of integration charges. 2026 is market-based; capacity value starts in 2027. Solar+storage gets Premium Peak and Non-Premium prices.Source: docs.idahopower.com: 85.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Energy rates (sample cells) |
Copied as printed: a few labelled cells, not the full rate matrix. The whole schedule is linked below. Note: Staff's March 2026 report gives 15-yr levelized (2026-2040) proposed prices of $52.96 (baseload), $47.12 (wind), $43.70 (solar) and $66.69 (solar+storage) per MWh. The Sept 2026 UM 2436 report lists different 'current' IPC levelized figures, which are unreconciled. Source: docs.idahopower.com: 85.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Capacity payment | No separate capacity rate. From 2027 to 2050 the On-Peak price (Premium-Peak for solar+storage) includes the capacity value of the proxy resource allocated to those hours. 2026 prices are market-only.Source: docs.idahopower.com: 85.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Contract terms | QFs may choose a contract length of up to 20 years. Schedule prices apply for contract years 1-15, and an index-based formula applies after that. Note: The 20-year sentence sits in the schedule's negotiation-guidelines section, not the standard-contract section. Source: docs.idahopower.com: 85.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Price fixity | Fixed schedule prices, times the seasonality factor, for contract years 1-15. After year 15 the seller elects Option 1 (Dead Band, a gas price indexed within 90-110% of forecast fuel cost) or Option 2 (Gas Market Method, Sumas gas index). Both options use the schedule's capacity payment for on-peak hours.Source: docs.idahopower.com: 85.pdf · checked 2026-10-04 | |||||||||||||||||||||
| Schedule link | https://docs.idahopower.com/pdfs/AboutUs/RatesRegulatory/Tariffs/85.pdfSource: docs.idahopower.com: 85.pdf · checked 2026-10-04 |
Values are copied as printed in the source. Where a value draws on more than one document, every source is listed, primary first.
Also in Oregon: Pacific Power (PacifiCorp), Portland General Electric. All 59 utilities. Get every utility as CSV/JSON.