Avista, Idaho: PURPA avoided-cost rates

Avista Utilities (Avista Corporation): what it publishes for small generators (qualifying facilities) under PURPA, field by field, with the source for each. Checked on October 4, 2026.

When this may change: Annual SAR natural-gas update: per Orders 37109/37110/37111 future update cases are initiated within one month of EIA's Annual Energy Outlook publication, effective three months after publication (Avista/PacifiCorp orders say 'within three months'). Rates are also re-run when a utility's cost of capital changes in a general rate case.

Rates, eligibility and contract terms change: confirm them with the utility or the state utility commission before relying on them.

ScheduleSchedule 62, Cogeneration and Small Power Production Schedule - Idaho (I.P.U.C. No. 28), paying IPUC-published SAR-based avoided cost rates for QFs at or below the Eligibility CapSource: myavista.com: id_062.pdf · checked 2026-10-04
Docket or orderIPUC Case No. AVU-E-26-04, Order No. 37110 (August 3, 2026)Source: puc.idaho.gov: 20260803Final_Order_No_37110.pdf · checked 2026-10-04
Effective date2026-08-03

Note: Order approves rates 'effective as of the date of this order', dated 3rd day of August 2026.

Source: puc.idaho.gov: 20260803Final_Order_No_37110.pdf · checked 2026-10-04
Next updateAnnual SAR natural-gas update: per Orders 37109/37110/37111 future update cases are initiated within one month of EIA's Annual Energy Outlook publication, effective three months after publication (Avista/PacifiCorp orders say 'within three months'). Rates are also re-run when a utility's cost of capital changes in a general rate case.Source: puc.idaho.gov: 20260803Final_Order_No_37110.pdf · also: puc.idaho.gov: 20251212Final_Order_No_36871.pdf, puc.idaho.gov: 20260728Final_Order_No_37109.pdf, puc.idaho.gov: 20260803Final_Order_No_37111.pdf · checked 2026-10-04
Size capWind and solar: 100 kW nameplate; all other QFs: 10 average MW in any given month. Larger QFs get IRP-based negotiated rates.Source: myavista.com: id_062.pdf · also: puc.idaho.gov: Avista Rates Order No. 37110 - New Contracts.pdf · checked 2026-10-04
Resource typesPublished non-fueled tables for Wind, Solar, Non-seasonal hydro, Seasonal hydro, Other. Schedule 62 also lists natural-gas-fueled levelized/non-levelized options and a Short-Term Rate (lower of non-levelized non-fueled rate or 85% of Mid-C index).Source: puc.idaho.gov: Avista Rates Order No. 37110 - New Contracts.pdf · also: myavista.com: id_062.pdf · checked 2026-10-04
Energy rate structureBy resource type, project online year and contract length; levelized or non-levelized. Heavy/Light Load Hour differential of $5/MWh (Daily Shape Adjustment); seasonal factors 108% (Jul-Feb) and 84% (Mar-Jun). Wind tables also show price less wind integration adjustment. Rates are published by IPUC per online year (2026-2031) and contract length (1-20 years), levelized and non-levelized; the 'Rate Effective Date' line in the published PDFs is left as the placeholder 'XXXX XX, 2026'.Source: puc.idaho.gov: Avista Rates Order No. 37110 - New Contracts.pdf · also: myavista.com: id_062.pdf · checked 2026-10-04
Energy rates (sample cells)
Cell (as labelled, with vintage)RateUnits
Solar, project on-line 2026, 20-year contract, levelized, Flat price (before seasonal factor)53.82$/MWh
Solar, project on-line 2026, 20-year contract, levelized, Heavy Load Hour (before seasonal factor)55.49$/MWh
Solar, project on-line 2026, 20-year contract, levelized, Light Load Hour (before seasonal factor)50.49$/MWh
Wind, project on-line 2026, 20-year contract, levelized, Flat price (before seasonal factor and integration)50.74$/MWh
Other, project on-line 2026, 20-year contract, levelized, Flat price (before seasonal factor)67.58$/MWh

Copied as printed: a few labelled cells, not the full rate matrix. The whole schedule is linked below.

Note: Table columns carry no unit label; units from the SAR model workbook header 'LEVELIZED RATES ($/MWH)' (AVU-E-26-04 Attachment C) and Schedule 62's $5 per MWh daily shape.

Source: puc.idaho.gov: Avista Rates Order No. 37110 - New Contracts.pdf · also: lf-puc.idaho.gov: ElectronicFile.aspx?docid=158002&dbid=0, myavista.com: id_062.pdf · checked 2026-10-04
Capacity paymentNone separate: published rates cover output 'including energy and capacity'. No energy-storage capacity table in Avista's current published rates.Source: myavista.com: id_062.pdf · checked 2026-10-04
Contract termsPublished rates tabulated for contract lengths of 1 to 20 years (full 20-year term available).Source: puc.idaho.gov: Avista Rates Order No. 37110 - New Contracts.pdf · also: lf-puc.idaho.gov: ElectronicFile.aspx?docid=157999&dbid=0 · checked 2026-10-04
Price fixityNon-fueled levelized and non-levelized rates are fixed for the contract term; fueled rates have an adjustable component changed periodically by Commission order; Short-Term Rate is market-indexed.Source: myavista.com: id_062.pdf · checked 2026-10-04
Schedule linkhttps://myavista.com/-/media/myavista/content-documents/our-rates-and-tariffs/id/id_062.pdf

Note: Current rate tables: https://puc.idaho.gov/FileRoom/PublicFiles/electric/Avista%20Rates%20Order%20No.%2037110%20-%20New%20Contracts.pdf

Source: myavista.com: id_062.pdf · checked 2026-10-04

Values are copied as printed in the source. Where a value draws on more than one document, every source is listed, primary first.