{
  "dataset": {
    "name": "PURPA avoided-cost rates dataset (pilot)",
    "snapshot": "2026-10-04",
    "publisher": "Hundred Dollar Labs",
    "url": "https://hundreddollarlabs.com/avoided-cost/data.html",
    "sample": "Free sample: id-ipc, nc-dec only. The full dataset covers 59 utilities.",
    "licence": {
      "Who it covers": "One organization: the company that buys it, and its employees and contractors working for it.",
      "What you may do": "Use the data inside your organization: internal tools and dashboards, your own compliance work, and reports or advice you prepare for your clients.",
      "Product licence": "To build the data into software or a service that other people use (an app, a calculator, a compliance tool or feed you offer to customers), you need a product licence. It includes a quarterly file of what changed. Email hello@hundreddollarlabs.com for one.",
      "What you may not do": "Resell, sublicense, share or republish the raw dataset, or a large part of it, as a dataset: no reposting the files, and no download, feed or API whose main purpose is to hand out the data.",
      "Where the facts come from": "Published utility tariff sheets, state utility commission orders and filings, and state statutes and rules. Each value links to its source. You are paying for our compilation: the selection, structure, notes and checking.",
      "No warranty": "Rates, eligibility rules and contract terms change, and we may have made mistakes. The data is provided as is, without warranty of any kind. Our total liability is limited to the price you paid.",
      "Not legal advice": "These are published-rate facts from public sources, not legal, financial or investment advice. Confirm rates and terms with the utility or the state commission before relying on them.",
      "12 months of updates": "For 12 months after purchase, your download link always serves the latest snapshot (up to 20 downloads in all), including any states we add in that time. We re-check each utility after its scheduled rate update. After 12 months the download link stops working, so keep your copy; a newer snapshot is a new purchase."
    }
  },
  "scope": "PURPA qualifying-facility standard-offer (published) avoided-cost rates for investor-owned utilities in a pilot sample of states (the counts are in the dataset itself). Rates are copied as printed in the primary tariff or commission order; nothing is estimated or interpolated. Where a schedule is a large matrix, a few clearly labelled cells are shown and the full schedule is linked.",
  "fields": [
    "schedule",
    "docket_or_order",
    "effective_date",
    "next_update",
    "eligibility_cap",
    "resource_types",
    "energy_rate_structure",
    "energy_rates",
    "capacity_payment",
    "contract_terms",
    "price_fixity",
    "schedule_url"
  ],
  "utilities": [
    {
      "id": "id-ipc",
      "state": "ID",
      "utility_name": "Idaho Power Company",
      "fields": {
        "schedule": {
          "value": "Schedule 73, Cogeneration and Small Power Production Schedule - Idaho (I.P.U.C. No. 30, Tariff No. 101), paying IPUC-published SAR-based avoided cost rates for QFs at or below the Eligibility Cap",
          "source": "https://docs.idahopower.com/pdfs/aboutus/ratesregulatory/tariffs/306.pdf",
          "sources": [
            "https://docs.idahopower.com/pdfs/aboutus/ratesregulatory/tariffs/306.pdf"
          ],
          "checked_on": "2026-10-04",
          "unverified": false,
          "note": "Rate tables themselves are published by IPUC (Avoided Cost Rates page) rather than printed in Schedule 73."
        },
        "docket_or_order": {
          "value": "IPUC Case No. IPC-E-26-13, Order No. 37109 (July 28, 2026), as corrected by Errata to Order No. 37109 (July 29, 2026)",
          "source": "https://puc.idaho.gov/Fileroom/PublicFiles/ELEC/IPC/IPCE2613/OrdNotc/20260728Final_Order_No_37109.pdf",
          "sources": [
            "https://puc.idaho.gov/Fileroom/PublicFiles/ELEC/IPC/IPCE2613/OrdNotc/20260728Final_Order_No_37109.pdf",
            "https://lf-puc.idaho.gov/WebLink/ElectronicFile.aspx?docid=160026&dbid=0"
          ],
          "checked_on": "2026-10-04",
          "unverified": false
        },
        "effective_date": {
          "value": "2026-07-28",
          "source": "https://lf-puc.idaho.gov/WebLink/ElectronicFile.aspx?docid=160026&dbid=0",
          "sources": [
            "https://lf-puc.idaho.gov/WebLink/ElectronicFile.aspx?docid=160026&dbid=0",
            "https://puc.idaho.gov/Fileroom/PublicFiles/ELEC/IPC/IPCE2613/OrdNotc/20260728Final_Order_No_37109.pdf"
          ],
          "checked_on": "2026-10-04",
          "unverified": false,
          "note": "Order 37109 as issued said 'effective June 1, 2026'; the July 29, 2026 errata changed this to 'effective as of the date of this order' (order dated July 28, 2026)."
        },
        "next_update": {
          "value": "Annual SAR natural-gas update: per Orders 37109/37110/37111 future update cases are initiated within one month of EIA's Annual Energy Outlook publication, effective three months after publication (Avista/PacifiCorp orders say 'within three months'). Rates are also re-run when a utility's cost of capital changes in a general rate case.",
          "source": "https://puc.idaho.gov/Fileroom/PublicFiles/ELEC/IPC/IPCE2613/OrdNotc/20260728Final_Order_No_37109.pdf",
          "sources": [
            "https://puc.idaho.gov/Fileroom/PublicFiles/ELEC/IPC/IPCE2613/OrdNotc/20260728Final_Order_No_37109.pdf",
            "https://puc.idaho.gov/Fileroom/PublicFiles/ELEC/AVU/AVUE2514/OrdNotc/20251212Final_Order_No_36871.pdf",
            "https://puc.idaho.gov/Fileroom/PublicFiles/ELEC/AVU/AVUE2604/OrdNotc/20260803Final_Order_No_37110.pdf",
            "https://puc.idaho.gov/Fileroom/PublicFiles/ELEC/PAC/PACE2608/OrdNotc/20260803Final_Order_No_37111.pdf"
          ],
          "checked_on": "2026-10-04",
          "unverified": false
        },
        "eligibility_cap": {
          "value": "Wind and solar: 100 kW nameplate; all other QFs: 10 average MW in any given month; energy storage: 100 kW or smaller. Larger QFs get IRP-based negotiated rates.",
          "source": "https://docs.idahopower.com/pdfs/aboutus/ratesregulatory/tariffs/306.pdf",
          "sources": [
            "https://docs.idahopower.com/pdfs/aboutus/ratesregulatory/tariffs/306.pdf",
            "https://puc.idaho.gov/Fileroom/PublicFiles/electric/Idaho%20Power%20Rates%20Order%20No.%2037109%20-%20New%20Contracts.pdf"
          ],
          "checked_on": "2026-10-04",
          "unverified": false
        },
        "resource_types": {
          "value": "Published non-fueled tables for Wind, Solar, Non-seasonal hydro, Seasonal hydro, Other, plus Energy Storage (<=100 kW). Schedule 73 also provides fueled (fossil) levelized/non-levelized options with an adjustable fuel component, but no fueled table appears in the current IPUC new-contract rate PDF.",
          "source": "https://puc.idaho.gov/Fileroom/PublicFiles/electric/Idaho%20Power%20Rates%20Order%20No.%2037109%20-%20New%20Contracts.pdf",
          "sources": [
            "https://puc.idaho.gov/Fileroom/PublicFiles/electric/Idaho%20Power%20Rates%20Order%20No.%2037109%20-%20New%20Contracts.pdf"
          ],
          "checked_on": "2026-10-04",
          "unverified": false
        },
        "energy_rate_structure": {
          "value": "By resource type, project online year and contract length; levelized or non-levelized. Heavy/Light Load Hour differential of $7.28/MWh (Daily Shape Adjustment); seasonal factors 73.5% (Mar-May), 120% (Jul, Aug, Nov, Dec), 100% (other months). Wind/solar subject to Schedule 87 integration charges (shown 'NA' in current tables). Rates are published by IPUC per online year (2026-2031) and contract length (1-20 years), levelized and non-levelized; the 'Rate Effective Date' line in the published PDFs is left as the placeholder 'XXXX XX, 2026'.",
          "source": "https://puc.idaho.gov/Fileroom/PublicFiles/electric/Idaho%20Power%20Rates%20Order%20No.%2037109%20-%20New%20Contracts.pdf",
          "sources": [
            "https://puc.idaho.gov/Fileroom/PublicFiles/electric/Idaho%20Power%20Rates%20Order%20No.%2037109%20-%20New%20Contracts.pdf",
            "https://docs.idahopower.com/pdfs/aboutus/ratesregulatory/tariffs/306.pdf"
          ],
          "checked_on": "2026-10-04",
          "unverified": false
        },
        "energy_rates": {
          "value": [
            {
              "label": "Solar, project on-line 2026, 20-year contract, levelized, Flat price (before seasonal factor)",
              "rate": "79.13",
              "units": "$/MWh"
            },
            {
              "label": "Solar, project on-line 2026, 20-year contract, levelized, Heavy Load Hour (before seasonal factor)",
              "rate": "82.37",
              "units": "$/MWh"
            },
            {
              "label": "Solar, project on-line 2026, 20-year contract, levelized, Light Load Hour (before seasonal factor)",
              "rate": "75.09",
              "units": "$/MWh"
            },
            {
              "label": "Wind, project on-line 2026, 20-year contract, levelized, Flat price (before seasonal factor)",
              "rate": "50.87",
              "units": "$/MWh"
            },
            {
              "label": "Other, project on-line 2026, 20-year contract, levelized, Flat price (before seasonal factor)",
              "rate": "68.94",
              "units": "$/MWh"
            }
          ],
          "source": "https://puc.idaho.gov/Fileroom/PublicFiles/electric/Idaho%20Power%20Rates%20Order%20No.%2037109%20-%20New%20Contracts.pdf",
          "sources": [
            "https://puc.idaho.gov/Fileroom/PublicFiles/electric/Idaho%20Power%20Rates%20Order%20No.%2037109%20-%20New%20Contracts.pdf",
            "https://lf-puc.idaho.gov/WebLink/ElectronicFile.aspx?docid=158007&dbid=0",
            "https://docs.idahopower.com/pdfs/aboutus/ratesregulatory/tariffs/306.pdf"
          ],
          "checked_on": "2026-10-04",
          "unverified": false,
          "note": "Table columns carry no unit label; units taken from the SAR model workbook header 'LEVELIZED RATES ($/MWH)' (IPC-E-26-13 Attachment C) and Schedule 73's $7.28 per MWh daily shape."
        },
        "capacity_payment": {
          "value": "None separate for generating QFs: published SAR rates cover energy and capacity. Energy storage QFs (<=100 kW) get a separate avoided cost of capacity for peak-hour generation, e.g. summer non-levelized 2027: 234.35 $/MWh; winter non-levelized 2027: 35.07 $/MWh.",
          "source": "https://puc.idaho.gov/Fileroom/PublicFiles/electric/Idaho%20Power%20Rates%20Order%20No.%2037109%20-%20New%20Contracts.pdf",
          "sources": [
            "https://puc.idaho.gov/Fileroom/PublicFiles/electric/Idaho%20Power%20Rates%20Order%20No.%2037109%20-%20New%20Contracts.pdf",
            "https://docs.idahopower.com/pdfs/aboutus/ratesregulatory/tariffs/306.pdf"
          ],
          "checked_on": "2026-10-04",
          "unverified": false
        },
        "contract_terms": {
          "value": "Published rates tabulated for contract lengths of 1 to 20 years (full 20-year term available).",
          "source": "https://puc.idaho.gov/Fileroom/PublicFiles/electric/Idaho%20Power%20Rates%20Order%20No.%2037109%20-%20New%20Contracts.pdf",
          "sources": [
            "https://puc.idaho.gov/Fileroom/PublicFiles/electric/Idaho%20Power%20Rates%20Order%20No.%2037109%20-%20New%20Contracts.pdf",
            "https://lf-puc.idaho.gov/WebLink/ElectronicFile.aspx?docid=158004&dbid=0"
          ],
          "checked_on": "2026-10-04",
          "unverified": false
        },
        "price_fixity": {
          "value": "Non-fueled levelized and non-levelized rates are fixed for the contract term; fueled rates have a fixed component plus an adjustable (fuel) component changed periodically by Commission order.",
          "source": "https://docs.idahopower.com/pdfs/aboutus/ratesregulatory/tariffs/306.pdf",
          "sources": [
            "https://docs.idahopower.com/pdfs/aboutus/ratesregulatory/tariffs/306.pdf"
          ],
          "checked_on": "2026-10-04",
          "unverified": false
        },
        "schedule_url": {
          "value": "https://docs.idahopower.com/pdfs/aboutus/ratesregulatory/tariffs/306.pdf",
          "source": "https://docs.idahopower.com/pdfs/aboutus/ratesregulatory/tariffs/306.pdf",
          "sources": [
            "https://docs.idahopower.com/pdfs/aboutus/ratesregulatory/tariffs/306.pdf"
          ],
          "checked_on": "2026-10-04",
          "unverified": false,
          "note": "Current rate tables: https://puc.idaho.gov/Fileroom/PublicFiles/electric/Idaho%20Power%20Rates%20Order%20No.%2037109%20-%20New%20Contracts.pdf"
        }
      }
    },
    {
      "id": "nc-dec",
      "state": "NC",
      "utility_name": "Duke Energy Carolinas, LLC",
      "fields": {
        "schedule": {
          "value": "Purchased Power Schedule PP (NC Seventeenth Revised Leaf No. 90, Electricity No. 4)",
          "source": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf",
          "sources": [
            "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf"
          ],
          "checked_on": "2026-10-04",
          "unverified": false
        },
        "docket_or_order": {
          "value": "NCUC Docket No. E-100, Sub 211 (2025 biennial avoided cost proceeding); Order dated August 17, 2026",
          "source": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf",
          "sources": [
            "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf"
          ],
          "checked_on": "2026-10-04",
          "unverified": false
        },
        "effective_date": {
          "value": "2025-11-03",
          "source": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf",
          "sources": [
            "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf"
          ],
          "checked_on": "2026-10-04",
          "unverified": false,
          "note": "Sheet reads 'Effective for energy and capacity rendered on and after November 3, 2025' while citing the Sub 211 order dated 2026-08-17; i.e. approved rates apply back to the Nov 2025 filing date."
        },
        "next_update": {
          "value": "Company updates rates on November 1, 2027 (or as otherwise directed by NCUC) and every two years thereafter; G.S. 62-156(b) requires NCUC to set standard-contract avoided cost rates at least every two years",
          "source": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf",
          "sources": [
            "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf",
            "https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_62/GS_62-156.html"
          ],
          "checked_on": "2026-10-04",
          "unverified": false
        },
        "eligibility_cap": {
          "value": "Contract Capacity of 1 MW or less (nameplate). Footnote: once 100 MW aggregate of post-Nov 16, 2016 LEO PPAs are executed, 'Monthly Rates' only available to sellers of 100 kW or less.",
          "source": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf",
          "sources": [
            "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf"
          ],
          "checked_on": "2026-10-04",
          "unverified": false
        },
        "resource_types": {
          "value": "Hydroelectric, trash or landfill-methane fueled, solar, wind, hog or poultry waste-fueled, or non-animal biomass-fueled QFs. Uncontrolled solar gets a separate (lower) energy credit row; controlled solar must use a negotiated PPA.",
          "source": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf",
          "sources": [
            "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf"
          ],
          "checked_on": "2026-10-04",
          "unverified": false
        },
        "energy_rate_structure": {
          "value": "Time-of-use energy credits (cents/kWh) by season (Summer Jun-Sep, Winter Dec-Feb, Shoulder) with on-peak, premium-peak and off-peak periods; separate columns for Two-Year Fixed Rate vs Fixed Long-Term Rate (10 years), each for distribution- vs transmission-interconnected; separate rows for uncontrolled solar. Hourly As-Available Rates (marginal cost, computed monthly after the fact) also offered.",
          "source": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf",
          "sources": [
            "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf"
          ],
          "checked_on": "2026-10-04",
          "unverified": false
        },
        "energy_rates": {
          "value": [
            {
              "label": "Fixed Long-Term (10 yr), distribution-interconnected, all but uncontrolled solar, on-peak Summer",
              "rate": "5.01",
              "units": "cents/kWh"
            },
            {
              "label": "Fixed Long-Term (10 yr), distribution-interconnected, all but uncontrolled solar, premium peak Winter",
              "rate": "7.02",
              "units": "cents/kWh"
            },
            {
              "label": "Fixed Long-Term (10 yr), distribution-interconnected, all but uncontrolled solar, off-peak Summer",
              "rate": "4.52",
              "units": "cents/kWh"
            },
            {
              "label": "Two-Year Fixed Rate, distribution-interconnected, all but uncontrolled solar, on-peak Summer",
              "rate": "4.90",
              "units": "cents/kWh"
            },
            {
              "label": "Fixed Long-Term (10 yr), distribution-interconnected, uncontrolled solar only, on-peak Summer",
              "rate": "4.90",
              "units": "cents/kWh"
            },
            {
              "label": "Fixed Long-Term (10 yr), distribution-interconnected, uncontrolled solar only, off-peak Shoulder",
              "rate": "4.02",
              "units": "cents/kWh"
            }
          ],
          "source": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf",
          "sources": [
            "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf"
          ],
          "checked_on": "2026-10-04",
          "unverified": false
        },
        "capacity_payment": {
          "value": "Separate capacity credit, Winter only (Dec-Feb), on-peak hours all Winter days 5:00-10:00 a.m.: 22.28 cents/kWh Fixed Long-Term (10 yr) distribution; 21.13 cents/kWh Two-Year Fixed distribution; 21.68 / 20.58 transmission. Same values printed for swine/poultry waste and certain hydro. No capacity credit on As-Available Rates.",
          "source": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf",
          "sources": [
            "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf"
          ],
          "checked_on": "2026-10-04",
          "unverified": false
        },
        "contract_terms": {
          "value": "Two-Year Fixed Rate (minimum two-year commitment for PPAs executed on/after Nov 1, 2025); Fixed Long-Term Rate (10 years); or As-Available (hourly) with no PPA term requirement",
          "source": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf",
          "sources": [
            "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf"
          ],
          "checked_on": "2026-10-04",
          "unverified": false
        },
        "price_fixity": {
          "value": "Fixed Long-Term rates fixed for the 10-year rate term (not affected by later updates); Two-Year Fixed Rates subject to change as of the initial filing date of each subsequent avoided cost proceeding; As-Available varies hourly",
          "source": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf",
          "sources": [
            "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf"
          ],
          "checked_on": "2026-10-04",
          "unverified": false
        },
        "schedule_url": {
          "value": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf",
          "source": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf",
          "sources": [
            "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf"
          ],
          "checked_on": "2026-10-04",
          "unverified": false
        }
      }
    }
  ],
  "quotes": {
    "id-ipc": {
      "schedule": [
        {
          "quote": "COGENERATION AND SMALL POWER PRODUCTION SCHEDULE - IDAHO",
          "source": "https://docs.idahopower.com/pdfs/aboutus/ratesregulatory/tariffs/306.pdf"
        }
      ],
      "docket_or_order": [
        {
          "quote": "CASE NO. IPC-E-26-13",
          "source": "https://puc.idaho.gov/Fileroom/PublicFiles/ELEC/IPC/IPCE2613/OrdNotc/20260728Final_Order_No_37109.pdf"
        },
        {
          "quote": "ORDER NO. 37109",
          "source": "https://puc.idaho.gov/Fileroom/PublicFiles/ELEC/IPC/IPCE2613/OrdNotc/20260728Final_Order_No_37109.pdf"
        },
        {
          "quote": "ERRATA TO ORDER NO. 37109",
          "source": "https://lf-puc.idaho.gov/WebLink/ElectronicFile.aspx?docid=160026&dbid=0"
        }
      ],
      "effective_date": [
        {
          "quote": "rates contained in the Application for the Company are approved, effective as of the date of this order.",
          "source": "https://lf-puc.idaho.gov/WebLink/ElectronicFile.aspx?docid=160026&dbid=0"
        },
        {
          "quote": "Boise, Idaho this 28th day of July 2026.",
          "source": "https://puc.idaho.gov/Fileroom/PublicFiles/ELEC/IPC/IPCE2613/OrdNotc/20260728Final_Order_No_37109.pdf"
        }
      ],
      "next_update": [
        {
          "quote": "Future update cases shall be initiated within one month of the EIA’s Annual Energy Outlook publishing date, with an effective date of three months following the publishing date.",
          "source": "https://puc.idaho.gov/Fileroom/PublicFiles/ELEC/IPC/IPCE2613/OrdNotc/20260728Final_Order_No_37109.pdf"
        },
        {
          "quote": "The SAR Model uses each utility’s approved cost of capital from their last general rate case.",
          "source": "https://puc.idaho.gov/Fileroom/PublicFiles/ELEC/AVU/AVUE2514/OrdNotc/20251212Final_Order_No_36871.pdf"
        }
      ],
      "eligibility_cap": [
        {
          "quote": "For wind and solar Qualifying Facilities, “Eligibility Cap” means 100 kilowatts (“kW”) nameplate capacity.",
          "source": "https://docs.idahopower.com/pdfs/aboutus/ratesregulatory/tariffs/306.pdf"
        },
        {
          "quote": "except wind and solar Qualifying Facilities, 10 average megawatts in any given month.",
          "source": "https://docs.idahopower.com/pdfs/aboutus/ratesregulatory/tariffs/306.pdf"
        },
        {
          "quote": "Eligibility for these rates is limited to energy storage projects 100 kW or smaller.",
          "source": "https://puc.idaho.gov/Fileroom/PublicFiles/electric/Idaho%20Power%20Rates%20Order%20No.%2037109%20-%20New%20Contracts.pdf"
        }
      ],
      "resource_types": [
        {
          "quote": "Resource: Non-seasonal hydro",
          "source": "https://puc.idaho.gov/Fileroom/PublicFiles/electric/Idaho%20Power%20Rates%20Order%20No.%2037109%20-%20New%20Contracts.pdf"
        },
        {
          "quote": "Resource: Seasonal hydro",
          "source": "https://puc.idaho.gov/Fileroom/PublicFiles/electric/Idaho%20Power%20Rates%20Order%20No.%2037109%20-%20New%20Contracts.pdf"
        },
        {
          "quote": "Resource: Other",
          "source": "https://puc.idaho.gov/Fileroom/PublicFiles/electric/Idaho%20Power%20Rates%20Order%20No.%2037109%20-%20New%20Contracts.pdf"
        }
      ],
      "energy_rate_structure": [
        {
          "quote": "Season 1 73.50% (Applied to March - May)",
          "source": "https://puc.idaho.gov/Fileroom/PublicFiles/electric/Idaho%20Power%20Rates%20Order%20No.%2037109%20-%20New%20Contracts.pdf"
        },
        {
          "quote": "Load rates and Light Load rates of $7.28 per MWh",
          "source": "https://docs.idahopower.com/pdfs/aboutus/ratesregulatory/tariffs/306.pdf"
        }
      ],
      "energy_rates": [
        {
          "quote": "20 79.13 82.37 75.09",
          "source": "https://puc.idaho.gov/Fileroom/PublicFiles/electric/Idaho%20Power%20Rates%20Order%20No.%2037109%20-%20New%20Contracts.pdf"
        },
        {
          "quote": "20 50.87 54.11 46.83",
          "source": "https://puc.idaho.gov/Fileroom/PublicFiles/electric/Idaho%20Power%20Rates%20Order%20No.%2037109%20-%20New%20Contracts.pdf"
        },
        {
          "quote": "20 68.94 72.18 64.90",
          "source": "https://puc.idaho.gov/Fileroom/PublicFiles/electric/Idaho%20Power%20Rates%20Order%20No.%2037109%20-%20New%20Contracts.pdf"
        },
        {
          "quote": "LEVELIZED RATES ($/MWH)",
          "source": "https://lf-puc.idaho.gov/WebLink/ElectronicFile.aspx?docid=158007&dbid=0"
        }
      ],
      "capacity_payment": [
        {
          "quote": "SUMMER AVOIDED COST OF CAPACITY FOR ENERGY STORAGE (IPCO)",
          "source": "https://puc.idaho.gov/Fileroom/PublicFiles/electric/Idaho%20Power%20Rates%20Order%20No.%2037109%20-%20New%20Contracts.pdf"
        },
        {
          "quote": "2027 234.35 1 $234.35",
          "source": "https://puc.idaho.gov/Fileroom/PublicFiles/electric/Idaho%20Power%20Rates%20Order%20No.%2037109%20-%20New%20Contracts.pdf"
        },
        {
          "quote": "2027 35.07 1 $35.07",
          "source": "https://puc.idaho.gov/Fileroom/PublicFiles/electric/Idaho%20Power%20Rates%20Order%20No.%2037109%20-%20New%20Contracts.pdf"
        },
        {
          "quote": "supply output including energy and capacity",
          "source": "https://docs.idahopower.com/pdfs/aboutus/ratesregulatory/tariffs/306.pdf"
        }
      ],
      "contract_terms": [
        {
          "quote": "allowing the potential for Idaho’s electric utilities to offer a full, 20-year",
          "source": "https://lf-puc.idaho.gov/WebLink/ElectronicFile.aspx?docid=158004&dbid=0"
        },
        {
          "quote": "20 79.13 82.37 75.09",
          "source": "https://puc.idaho.gov/Fileroom/PublicFiles/electric/Idaho%20Power%20Rates%20Order%20No.%2037109%20-%20New%20Contracts.pdf"
        }
      ],
      "price_fixity": [
        {
          "quote": "term of the agreement and shall be fixed for the term. The rate components are subject to Seasonal",
          "source": "https://docs.idahopower.com/pdfs/aboutus/ratesregulatory/tariffs/306.pdf"
        },
        {
          "quote": "The adjustable component rate shall be changed periodically subject to Commission",
          "source": "https://docs.idahopower.com/pdfs/aboutus/ratesregulatory/tariffs/306.pdf"
        }
      ]
    },
    "nc-dec": {
      "schedule": [
        {
          "quote": "PURCHASED POWER SCHEDULE PP",
          "source": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf"
        },
        {
          "quote": "North Carolina Seventeenth Revised Leaf No. 90",
          "source": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf"
        }
      ],
      "docket_or_order": [
        {
          "quote": "NCUC Docket No. E-100, Sub 211, Order dated August 17, 2026",
          "source": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf"
        }
      ],
      "effective_date": [
        {
          "quote": "Effective for energy and capacity rendered on and after November 3, 2025",
          "source": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf"
        }
      ],
      "next_update": [
        {
          "quote": "will be updated by the Company on November 1, 2027, or as otherwise directed by the North Carolina Utilities Commission, and every two years thereafter",
          "source": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf"
        },
        {
          "quote": "At least every two years, the Commission shall determine the standard contract avoided cost rates",
          "source": "https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_62/GS_62-156.html"
        }
      ],
      "eligibility_cap": [
        {
          "quote": "with a Contract Capacity of one (1) megawatt or less, based on the nameplate rating of the generator(s)",
          "source": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf"
        },
        {
          "quote": "Monthly Rates will only be available thereafter to Sellers establishing a Legally Enforceable Obligation after November 16, 2016 with a Contract Capacity of 100 kW or less",
          "source": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf"
        }
      ],
      "resource_types": [
        {
          "quote": "hydroelectric or a generator fueled by trash or methane derived from landfills, solar, wind, hog or poultry waste-fueled",
          "source": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf"
        }
      ],
      "energy_rates": [
        {
          "quote": "a. Summer 4.90 5.01 4.78 4.89",
          "source": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf"
        },
        {
          "quote": "2. Winter 6.16 7.02 6.00 6.84",
          "source": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf"
        },
        {
          "quote": "a. Summer 4.25 4.52 4.18 4.45",
          "source": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf"
        },
        {
          "quote": "a. Summer 4.79 4.90 4.67 4.78",
          "source": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf"
        },
        {
          "quote": "c. Shoulder 3.91 4.02 3.86 3.97",
          "source": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf"
        },
        {
          "quote": "Rate (10 years)",
          "source": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf"
        }
      ],
      "capacity_payment": [
        {
          "quote": "Winter 21.13 22.28 20.58 21.68",
          "source": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf"
        },
        {
          "quote": "The on-peak hours shall be all Winter days from 5:00 a.m. to 10:00 a.m.",
          "source": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf"
        }
      ],
      "contract_terms": [
        {
          "quote": "executed on or after November 1, 2025, are required to commit to at least a two year term",
          "source": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf"
        },
        {
          "quote": "Rate (10 years)",
          "source": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf"
        }
      ],
      "price_fixity": [
        {
          "quote": "Sellers who have contracted for the Fixed Long-Term Energy and Capacity Credits will not be affected by updates in the Energy and Capacity Credits until their rate term expires",
          "source": "https://www.duke-energy.com/_/media/pdfs/for-your-home/rates/electric-nc/ncschedulepp.pdf"
        }
      ]
    }
  }
}
